Примеры использования Drilling programme на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Drilling programme for FY 2016 was completed by end of Q3,
Successful completion of 2016 drilling programme including the commissioning of three new production wells at Chinarevskoye during H2 2016.
Drilling programme for FY 2016 completed in Q3,
We are continually analysing and adjusting the drilling programme to optimise the current drilling capex as well as to maximise the speed of the ramp up once GTU3 is complete.
Our current drilling programme allows us to maintain production above 40,000 boepd without jeopardising our liquidity position.
Drilling programme for 2016 completed
We also completed our drilling programme as expected, with better results than anticipated from two out of the three production wells.
Our 2016 drilling programme will initially be set targeting the addition of three new production wells
We will reduce the 2016 drilling programme to three new production wells
The drilling programme is reviewed on a quarterly basis
but a planned drilling programme around potential repatriation sites had been put on hold.
We will look to preserve the balance sheet to avoid running our cash balances too low while ramping up the drilling programme.
The substantial portion of cash used in investing activities is related to the drilling programme and the construction of a third unit for the gas treatment facility.
Once the Gas Treatment Unit is operational the focus of the Company will move towards ramping up the drilling programme in order to fill GTU3.
Given the low oil price assumption Nostrum has submitted to the reserve consultants a drilling programme that is lower cost than previously anticipated.
Historically, Zhaikmunai's production growth has been primarily driven by its growing drilling programme 2008, 2009, and 2010.
These excellent results allow Zhaikmunai to pursue its growth strategy through its ambitious drilling programme and further preparatory work around the planned third train of the GTF.
and the original drilling programme was resumed
resources has been completed, a planned drilling programme around potential repatriation sites in the eastern part of the Territory has been put on hold in order to avoid a costly initial investment in the absence of a fixed date for the referendum.
2019 we will only be able to guide on this once the drilling programme for 2018 has been finalised and the results from the remaining appraisal wells in 2017 have been obtained.