Примери за използване на Complete drying на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Cleaning the surface passes only after the complete drying of the seams.
Lamps and chandeliers mount only after complete drying.
The final stage of preparation is the complete drying of the glass surface.
The first layer- the start- is the basic and applied after complete drying of the primer.
We are waiting for complete drying.
Again, after the complete drying of dry sand is poured to a height of not less than 100 mm.
The subsequent layer of waterproofing is applied after the complete drying of the first layer with an interval of about 6 hours.
After complete drying of the tile adhesives
After this, it is necessary to wait for complete drying of the floor, if a wet cleaning was carried out.
The amount of time required for complete drying of the composition directly depends on the degree of humidity,
Complete drying of the paint occurs after 6 to 9 months and then can be applied to the final varnish.
Perlite must dry for several days(the time for complete drying of the mixture is usually 5-6 days),
Without waiting for a complete drying, the stencil must be removed
If necessary, repeat the application layer should wait for the complete drying of the previous one.
The time for the complete drying of the cement screed depends on the humidity level in the room
After complete drying, you can remove this design
If laminated glass is mounted after cutting without washing and complete drying, corrosion becomes highly probable.
4 weeks after complete drying of the floor is ready.
The complete drying of the sleeves for several days is important because otherwise mould can develop.
For complete drying of the soil will take about 5 days, during which it is moistened with water.