Примери за използване на High-speed line на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The project would cost more than $230 billion and be over 7,000 kilometers(4,350 miles) long, the Beijing Times reported-- more than three times the world's current longest high-speed line, from the Chinese capital to the southern city of Guangzhou.
still too low to provide a convincing argument for building a fully fledged high-speed line.
300 km/h new high-speed line 300 7.5 55 570 Upgraded conventional line 200 1.8 65 Source: ECA.
effectiveness of keeping these stations as stops on the high-speed line(the 100% 60-minute catchment area overlap for Guadalajara station is because of its proximity to Madrid).
only the proposed construction of a high-speed line is assessed,
Application of this tsi to new high-speed lines being put into service.
Specially upgraded high-speed lines equipped for speeds of the order of 200 km/h.
The first high-speed lines in China are fairly recent.
Additional requirements, concerning high-speed lines are specified hereafter.
Application of this tsi to high-speed lines already in service.
Specially upgraded high-speed lines equipped for speeds of the order of 200 km/h.
According to Annex I of the Directive, high-speed lines comprise.
According to Annex I of the Directive, high-speed lines comprise.
Application of this tsi to high-speed lines already in service.
These plans must cater for the assessment of high-speed lines, where relevant.
So as to limit the risk of collision between road vehicles and trains, high-speed lines of category I shall not have level crossings opened to road traffic.
New high-speed lines across the EU offer European citizens a safe,
Fully-automatic high-speed lines with video surveillance, equipped for production of different dimensions and models.
it affects the sustainability of high-speed lines: high-speed rail does not compete on an equal basis with other transport modes.
However, on three of the seven completed high-speed lines we audited, the number of passengers carried was far lower.