Eksempler på brug af Power transformer på Engelsk og deres oversættelser til Dansk
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
Also note that the power transformer primary, secondary
In addition, there is a possibility that the temperature rise of the power transformer itself is too high,
The typical application of the HIPOT tester is as follow: 1 Power Transformer AC high voltage withstand test 2 Circuit….
the voltage transformer are similar to those of the power transformer.
The fiber optic technology is linked to the local detection of the power transformer, and the technological innovation of the local detection of the transformer is realized.
A feature of the inverter is reduced overall dimensions of the power transformer, reducing their size
which forwards higher requirement on energy saving of the power transformer.
The power transformer connection group is one of the important parameters of the power transformer, and is an important condition for the parallel operation of the power transformer.
This allows to halve the cost of electricity in comparison with those on the arc power transformer devices.
that is, the load of the power transformer is too large,
DC method: Connect a dry battery to the high voltage terminal of the power transformer, and connect a milliampere meter or microampere meter to the secondary side of the power transformer.
Inspection and acceptance project of power transformer before it is put into operation Apr 30, 2019.
which is often found in the MOS tube of the power transformer and the design of the transformer itself.
drawing cool air in over the power transformer, through the fan, and then over the heat sink.
HZ-600A+ sfra transformer sweep frequency response analysis The transformer winding deformation tester is used for power transformer with voltage grade of 6kV
Meet with power measurement of the non-metallic alloy and large power transformer etc testing product with low power factor.
reliable solutions for power transformer to realize on-line remote DGA analysis.
However, for a three-phase power transformer, the obtained signal is the sum of the three-phase partial discharge signals,
The power monitoring of partial discharge of power transformer mainly includes monitoring of internal charge distribution,