Examples of using
生产控制
in Chinese and their translations into English
{-}
Political
Ecclesiastic
Programming
内部生产控制加上技术文件评审,以及周期性评审程序,具体内容见附录4.
Internal control of production with assessment of technical documentation and periodical checking as described in Annex VI of the directive.
精密组件的分部装配,包括生产控制和质量保证系统,以保证生产正常运行。
Subassembly of sophisticated components, with production control and quality assurance systems to keep production running.
级是生产控制级别,不直接控制过程,但涉及监控生产和目标。
Level 3 is the level of production control that does not directly control the process, but it monitors production and objectives.
级是生产控制级别,不直接控制过程,但涉及监控生产和目标。
Level 3, it is the production control level which does not directly control the processors and machines but is concerned with monitoring the system.
洛氏硬度是一种针对生产控制开发的快速硬度测试方法,使用直接读数,主要用于金属材料。
Rockwell is a fast hardness test method developed for production control, with a direct readout, mainly used for metallic materials.
这条生产线的第一个部分包括对单向增强材料的自动切割和预成型,这也是展示生产控制系统的一个方面。
The first part of the line includes automatic cutting and preforming of unidirectional reinforcements, which is also an aspect of the production control system.
采矿和建筑材料生产场所的全自动X射线衍射分析为生产控制提供了更具成本效益的解决方案。
Fully automated X-ray diffraction analysis in mining and building materials production sites results in more cost-effective solutions for production control.
技术(Technology)--在计算机上运行的应用软件、生产控制系统等。
Technology- Software applications running on a computer, manufacturing controls systems, etc.
(w) Production control. Oversee the quality assurance function to ensure that all systems are placed into the production environment only after undergoing a comprehensive evaluation and user acceptance test;
Your benefits: optimal production control, total quality documentation, reduced planning and testing effort… in short, a coherent, unified system for maximum production efficiency.
Noting further the submission by France of an action plan that confirms compliance with the Protocol' s hydrochlorofluorocarbon production control measures for 2012 and subsequent years.
Seven Parties operating under Article 5 had reported data showing deviations from their consumption or production control schedules for 2004; the listing was given in table 12 of the data report.
中文
Bahasa indonesia
日本語
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt