Examples of using Subsea in English and their translations into Danish
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
As a consequence operators are often using a mix of different generations of subsea equipment and control fluids have to accommodate a wider variety of equipment, increasingly in sub optimal conditions.
We can manufacture load cells to higher ratings if necessary for applications in radius areas or even subsea.
Subsea load monitoring applications such as mooring, tie downs and anchors, and ROV pin applications also use our range of 17-4PH stainless steel subsea loadpins.
is a pioneering formulation designed to simplify subsea operations and offer enhanced system protection compared to products currently on the market.
A consortium of tech companies will be building out yet another Asia-Pacific subsea cable, with the 60Tbps Jupiter cable system to connect the US with Japan and the Philippines.
the latter option usually preferred when the shackle is to be fitted subsea to a mooring or tie-down.
has launched the Subsea Link, a standard product for applications up to 2,000m(6,562 feet) beneath the water's surface.
which is usd on surface and subsea drilling in H2S filed services.
TE SubCom's cable-laying ship is berthed in Sydney ahead of laying the Hawaiki subsea cable from Equinix's SY4 datacentre.
At Solar Solve we are very proud of the good relationship we have with Subsea 7 and work very hard to ensure that we retain it.”.
to construct a high-capacity Perth-to-Singapore subsea cable.
including offshore and subsea technologies, and unmanned vehicles and submarine acoustics.
Telstra will support two new subsea cables being built to connect Hong Kong with the West Coast of the US,
offshore personnel will be among those to note the Subsea Link's construction from 17-4PH stainless steel
requires a 40-tonne plough to bury the cable to protect it from existing subsea cables, fishing vessels,
it is my experience that Subsea 7 are thoughtful owners who do all they can to eliminate unnecessary stress for their on-board personnel.”.
as is the case with subsea operations.
The“FASTER” 10,000km subsea cable system connecting Japan with the west coast of the United States,
marine, subsea, construction and military.
where attendees noted its potential in subsea and submersible projects where accurate load monitoring is required.

