Examples of using Backfilling in English and their translations into Italian
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Programming
-
Official/political
dry backfilling mixes for brick linings
The trench backfilling, and in general the backfilling of all types of excavation, is the most important operation for cable duct installation.
The treatment of space(from clearing/backfilling to overall redevelopment)
Divert CDW from landfilling and backfilling, either through increased charges
At least there targets should be differentiated for high quality recycling and backfilling operations.
Technology such waterproofing should be calculated at the beginning of construction, at a backfilling the excavation.
had filed a plea against the government's decision regarding the backfilling of the camp.
for padding and backfilling, between 0.6 and 1m³ of material per linear meter according to whether the trench has been dug using an excavator or a trencher.
Also the backfilling seems to be later,
laying and backfilling used by Sirti in several cities in Italy.
soil compaction, backfilling pits and trenches after the installation of foundations
can be used for drainage profiled membrane laid between the geotextile and backfilling.
The backfilling is done with the excavation fill material,
building construction, backfilling for pipeline, gymnasium ground pipeline channel
The Riddle Buckets are intended for simpler sorting jobs where there is no access to sorted material for backfilling, or for other jobs that require material without large rocks.
quality of the works and backfilling of excavations and voids with a suitable material which will not obstruct
groove wider than 0.8m, building construction, backfilling for pipeline and gymnasium ground.
Simex“ST” asphalt pavers are the perfect attachment for applications such as backfilling trenches with possibility to leave 10 cm of material over the surface, which is then compacted efficiently by the Simex
building construction, backfilling for pipeline, gymnasium ground pipeline channel
is that â by 2020, the preparing for re-use, recycling and other material recovery, including backfilling operations using waste to substitute other materials,