Examples of using Johan sverdrup development in English and their translations into Norwegian
{-}
-
Colloquial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
And in 2019 the last two topsides and remaining bridges will be put in place before startup of the first phase of the Johan Sverdrup development expected in November next year.
senior vice president for the Johan Sverdrup development.
installation of two high-voltage cables supplying power from shore for the second phase of the Johan Sverdrup development.
Although she has a law degree, she's currently working as head of the project to digitalise the Johan Sverdrup development, one of the largest oil discoveries ever made on the Norwegian shelf.
senior vice president for the Johan Sverdrup development.
senior vice president for the Johan Sverdrup development.
senior vice president for the Johan Sverdrup development.
senior vice president for the Johan Sverdrup development.
senior vice president for the Johan Sverdrup development.
Includes both phase 1 and phase 2 of the Johan Sverdrup development.
The Johan Sverdrup development will create ripple effects for the whole society.
Phase 1 of the Johan Sverdrup development is well underway with planned startup in late 2019.
The investment costs for phase one of the Johan Sverdrup development are estimated at some NOK 117 billion(2015 value).
The Johan Sverdrup development passed the halfway mark over the summer,
We are the operator of both phases of the Johan Sverdrup development, and safe and efficient operations are the most important prerequisite for our operations.
During the quarter, the FEED phase was completed for the Johan Sverdrup development, leading up to submission of the plan for development
In the first phase of the Johan Sverdrup development, three standard templates will be installed north
installation of the power cables for the first phase of the Johan Sverdrup development, which were installed in the spring of this year.
The investment costs for phase 1 of the Johan Sverdrup development are estimated at some NOK 117 billion NOK(2015 value). Recoverable resources are projected at between 1.4 and 2.4 billion barrels of oil equivalent.
This contract award is conditional on an investment decision for the Johan Sverdrup development in February 2015, and is subject to the approval of the Plan for Development and Operation for the field in Parliament in 2015.