Examples of using Generating capacities in English and their translations into Russian
{-}
-
Official
-
Colloquial
Excessive generating capacity in spring and summer.
Energy conservation in central generating capacity for electricity production.
Share in electricity generating capacity.
Both companies plan to modernize their generating capacity, upgrade distribution network.
Data for electricity generation and electricity generating capacity are for 2010.
Its generating capacity is 1150 MWe.
The total generating capacity was 16.36 GW.
The Montserrat Electricity Company plans to upgrade generating capacity.
The Russian Federation intends to double its nuclear generating capacity by 2020.
Over the longer-term, it is likely that the lack of sufficient generating capacity will continue until at least 2012.
The central issue is the great shortage of effective generating capacity, partly as a result of a prolonged drought.
The inability to increase generating capacity over the past six years will prove costly for the economy
Since energy supply reliability is directly linked to the technical condition of our generating capacity and our performance, we constantly focus on the following areas.
They set up their generating capacity based on the assumption that they would be able to sell power at a great markup during times of peak consumption.
In this case, the share of renewable energy in electricity generation is reduced to 4.6 per cent and in electricity generating capacity to 8.0 per cent.
Once adequate generating capacity exists, the cost of grid electricity distribution depends on the cost of transmission line construction, distance from the transmission line
In addition, there are concerns that expansion of acetylene-based production in China will result in electric power shortages given that China's electricity generating capacity is already strained. ICIS, 2008.
electricity generation and electricity generating capacity.
introduction of new generating capacity, ever-increasing pace ahead of construction
Overall, Gazprom Energoholding committed to commission a total of 9 GW of generating capacity as a result of its construction and upgrade projects under the CSA programme from 2007 to 2016.