Examples of using Library building in English and their translations into Russian
{-}
-
Official
-
Colloquial
The full site under consideration includes both the grounds of the existing South Annex Building and the Library Building.
The estimated project cost to complete the capital master plan includes the $65.0 million original budget for the Dag Hammarskjöld Library Building and the South Annex Building. .
Studies are still under way on the level of protection that can be provided for the Dag Hammarskjöld Library Building and the South Annex Building. .
Renovation of the Dag Hammarskjöld Library Building and the South Annex Building remains suspended because of security concerns,
They have allowed for sustainable cooperation ranging from book donation to library building, training and co-publishing.
A new public library building was erected by the Heydar Aliyev Foundation in Mardakan settlement of Baku's Khazar District in 2005.
The Dag Hammarskjöld Library will conduct the following training(in English) for delegates and staff of permanent missions, at the Library Building, Room L-166(First Floor),
For the long-term, the functions of the Dag Hammarskjöld Library Building and the South Annex Building were incorporated in all options for long-term office accommodations in New York(see A/68/734,
minor alterations of the postal and gift centre in the Dag Hammarskjöld Library Building.
requirements for the structures on the southern perimeter of the Headquarters complex, namely the Dag Hammarskjöld Library Building and the South Annex Building the cafeteria.
Support Services has expressed the opinion that the library building structure was not designed to support compact shelving, which is very heavy.
as well as in the Library Building.
the Dag Hammarskjöld Library Building are discussed in section IX of the present report.
accelerated strategy IV included the renovation of the Dag Hammarskjöld Library Building and the South Annex Building. .
present updated information and options, as well as financial implications, on the renovation of the South Annex Building and the Dag Hammarskjöld Library Building.
excluding the original estimated costs for suspended construction of the Dag Hammarskjöld Library Building and the South Annex Building. .
financial implications in relation to the renovation of the South Annex Building and the Dag Hammarskjöld Library Building.
the protection requirements for the structures on the southern perimeter of the Headquarters, namely the Dag Hammarskjöld Library Building and the South Annex Building the cafeteria.
Renovation of the Dag Hammarskjöld Library Building and the South Annex Building,
the Krakowskie Przedmieście gate, a library building was erected to a design by Antoni Jabłoński-Jasieńczyk and Stefan Szyller,