Examples of using Ore reserves in English and their translations into Russian
{-}
-
Official
-
Colloquial
Mineral resources and ore reserves The adjacent table sets out the Company's interest in total proven and probable gold reserves. .
Somincor has been applying since 1997 the Australasian Code for Reporting of Mineral Resources and Ore Reserves The JORC Code.
Ore reserves under JORC(Proven and Probable)*- 190.7 million tonnes// 31.4% KCl// 59.9 million tonnes KCl.
it contains significant JORC Mineral Resources and Ore Reserves, suitable for processing in a RIP plant.
Mineral Resources and Ore Reserves as reported herein is Dr Mike Armitage, C. Eng.
Producing Property Mineral assets for which current Ore Reserves are declared
The risk that changes in technical and economic parameters result in the Ore Reserves as reported herein becoming un-economic in changed circumstances.
Proved Ore Reserves totalling 427.4Mt grading 0.064%U and containing 274.1ktU; and Probable Ore Reserves totalling 457.3Mt grading 0.056%U
Dr Mike Armitage has been responsible for the reporting of Mineral Resources and Ore Reserves on various properties internationally during the past 35 years.
The JORC Code distinguishes between Mineral Resources and Ore Reserves, based on the nature of the technical and economic evaluation carried out.
the world's second largest deposit in terms of ore reserves.
Brazil is endowed with the world's sixth largest uranium ore reserves, with 70 per cent of the territory still to be prospected.
As at 30 June 2018, the Ore Reserves at block Kharassan 2 of the North Kharassan deposit contained 22.4 thousand tonnes of UME.
Polyus' ore reserves are estimated at 68 moz of gold,
In relation to the Neves-Corvo Mine the Department of Geology only reports mineral resources and not ore reserves.
SRK's review has rather been restricted to confirming that the stated Mineral Resources and Ore Reserves in this document are within the licences
yield new Ore Reserves to replace or expand current Ore Reserves.
SRK considers that should the Ore Reserves as presented herein be re-stated in accordance with the reporting requirements of the SEC, specifically Industry Guide 7, such Ore Reserves would not be materially different.
Both the Mineral Resources and Ore Reserves reflect the quantity of in-situ uranium planned to be extracted
the aggregate Proved and Probable Ore Reserves(the“Ore Reserves”)