Examples of using Target loads in English and their translations into Russian
{-}
-
Official
-
Colloquial
In the EC analyses, target loads were interpolated between different levels of ambition represented by a scenario for expected changes under current legislation
A simple dynamic model for calculating target loads and delay times for heavy metals was presented.
sources of uncertainty in critical and target loads.
Air quality standards, target loads or deposition standards may also be important indicators for determining whether a Party is meeting its air quality goals.
Target loads lower than critical loads could protect 51% of the area in 2030.
The Group urged all ICPs and their NFCs to include ICP monitoring sites when reporting critical loads and target loads to CCE for consistency checking
Mapping calculated that critical and target loads were still exceeded in some parts of Europe.
A relatively low percentage of the ecosystem area could recover with target loads lower than critical loads in 2030(column 5)
data on critical and target loads to CIAM and noted the new methodologies that would facilitate optimization;
In the ensuing discussion delegates concluded the use of dynamic modelling and target loads was possible in the review of the Gothenburg Protocol.
The Working Group noted that time-dependent target loads were always smaller than critical loads. .
Invited the Coordination Centre for Effects(CCE) to make a call for European critical and target loads data as preparation for use in a possible revision of the Gothenburg Protocol;
An additional 24% would recover in 2030 if target loads were set equal to the critical loads. .
An important future application of this approach would be to use the linked models to define biodiversity-based target loads.
The Group agreed on the use of the critical load function at sites where there were no calculated target loads.
Appreciated the progress made by the Joint Expert Group on Dynamic Modelling in assessing the applicability of dynamic models and target loads in the review of the Gothenburg Protocol.
Important dynamic modelling results for possible use by the Task Force on Integrated Assessment Modelling were target loads.
He also noted the importance of nitrogen processes for dynamic modelling of effects and critical and target loads.
i.e. target loads, might be numerous.
In the ensuing discussion the importance of dynamic modelling, in addition to the calculation of critical and target loads, was acknowledged.