Examples of using Test set in English and their translations into Russian
{-}
-
Official
-
Colloquial
on a par with a CG test from the NPB test set.
Dc withstand voltage dielectric test set 400kv 5ma dc hipot tester 400kv 5ma dc hipot tester S pecifications: Power: AC220V+10%, 50Hz+1%;
for example, from the STREAM test set.
to achieve 0.8572 on the test set.
Built in the test set perl modules are extremely slow,
With every CMC test set a Standard Accessory Package comprising an appropriate selection of the following items is included.
With an OMICRON test set a special polarity check signal is injected, for example, into the primary side of a CT.
plausibility checks of current transformers, by using primary injection of high currents from the test set.
This information is then distributed across the network allowing any IED or test set to retrieve it.
The distance between the CMGPS 588 and the test set can be extended up to 95 m/ 312 ft by using extension cables.
In addition, a test set of 830 images was also used;
Primary current injection test set adopts ARM Chip to control its output process
Note: The customer's actual test set up is confidential and hence is not displayed in this application note.
Transformer Winding Resistance& On-Load Tap Changer Test Set 1 Overview The DC resistance test of the transformer winding is the essential test item of the transformer after overhauling, overhauling and changing the tap changer.
ADMO's Test Set Management section enables you to add the test sets you use for your maintenance tasks,
The relay test set can not always use the generator power supply, because the generator supply voltage is very unstable, the relay test set is a precision instrument, the voltage fluctuation range is too large for a long time, it will cause damage to the relay test set.
the accuracy of such models is checked on a test set and then run on new data.
High voltage switch dynamic characteristics test set circuit breaker analyser I. T echnical P arameters 1.1 Using Environments Input Power 220V±10% 50Hz±10% Air Pressure 86~ 106kpa Temperature- 10~ 40℃ Humidity≦ 80%RH 1.2 Safety P erformance I nsulation R esistance>
it could be argued that the test set forth in article 16(a)
power transformer equipment, familiarized themselves with the work ofthe test set and the course ofcommissioning the production ofSF6 switchgear and control gear(GIS).