Voorbeelden van het gebruik van The wind farm in het Engels en hun vertalingen in het Nederlands
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Computer
-
Ecclesiastic
-
Official/political
-
Programming
How long before the wind farm is ready?
The wind farm design process was previously cumbersome and could last weeks.
Siemens will maintain the wind farm for a minimum period of fifteen years.
The wind farm was opened on 26 September 2009.
On June 4th, 2008 the wind farm was renamed Princess Amalia Wind Farm. .
Connecting the wind farm to the grid.
In it we established how we would cooperate in developing the wind farm.
Seals can be observed throughout the North Sea including the wind farm.
Construction of the wind farm, located 5 miles off the coast of Skegness, started in 2010.
The wind farm has been developed by a consortium led by Northland Power, while Van Oord is the main contractor.
once the offshore transformer station of the wind farm has been built.
This will increase the present efficient utilisation of a connection between the wind farm and the mainland from roughly 40% towards 100.
The wind farm will produce over 130kWh of electricity annually,
To maintain the wind farm, an average 20 maintenance technicians will be based permanently at sea.
In 2001 the total investment in the wind farm was estimated at Euro 300 million.
At least they get the wind farm… instead of empty promises