Within the preparation ofthe branch tooperate successfully through the autumn-winter 2012- 2013 peak loads the investment program ofBryanskenergo for 2012 planned toextend ROWs inanarea of479.6 hectares along overhead power lines.
for example, that limit values are adhered to, and that penalties for peak loads are avoided.
which is important at peak loads in the consumer' system.
In the near future the company's branches will receive the first certificates of readiness for winter peak loads.
of the elevators and transshipment ports during peak loads.
Mobile crews will allow the company torespond quickly topossible major technological violations during peak loads, ifnecessary, inatimely manner toassist the energy sector ofthe neighboring regions.
Develop the database structure in such a way that the data exchange would be conducted fast even at the peak loads.
communal services and utilities during peak loads.
other enterprises inthe regions involved inthe operation through peak loads.
Thus, the branch has completed preparations for the work during the winter peak loads and successfully passed the inspections ofthe committee.
The representatives ofthe energy industry stressed that the Russian power grid complex successfully operated the autumn-winter peak loads.
which may become unstable while working with peak loads.
Tashlyk PSP is designed to compensate peak loads in the south-west part of Ukraine integrated power system(IPS)
In addition, our moderators occasionally experience peak loads due to authors' increased interest in the Clashot project.
maintaining performance even under the peak loads typical of racing conditions.
From the perspective of sustainability, an integrated grid would balance peak loads by using larger transmission grids across different time zones, as well as
During the past autumn and winter peak loads emergency crews of Voronezhenergo not only quickly eliminated technological disturbances in the service area of the branch,
calculate possible peak loads, also take into consideration particular qualities of environment in which the network will be launched.
The competition, conducted inorder toverify the readiness ofoperators towork incomplicated grid operation mode conditions during peak loads, as well astoshare best work experience,
In particular, the existing throughput capacity of two 500 kV«North-South»transmission lines is not enough to cover peak loads in the Southern energy area due to the transfer of electricity from the Northern area.