Примеры использования Revised cost estimates на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The revised cost estimates for the period from 10 December 1994 to 9 June 1995 include a total provision of approximately $500,000 for insurance.
III. Revised cost estimates for the period from 5 May 1999 to 30 November 1999.
The revised cost estimates shown in annex I, column 2,
The revised cost estimates are based on requirements for only one post, that of Assistant Secretary-General for Management and Coordination.
The Committee further requests the Secretary-General to provide an update and revised cost estimates to the Assembly at the time of its consideration of the proposed 2014/15 budget for UNMISS.
The Advisory Committee believes that the revised cost estimates for air operations show an increase mainly because additional flying hours have been estimated. .
I have also submitted revised cost estimates for the period from 1 January to 30 June 1996.
Supplementary information on the revised cost estimates for the period from 1 July 1997 to 30 June 1998.
He also noted the revised cost estimates, and stressed that the proposed budget level should be approved
The revised cost estimates reflect a 39 per cent decrease from the original cost estimates shown in document A/50/655/Add.1.
Information on the revised cost estimates is presented in annex II. A,
Requests the Secretary-General to submit revised cost estimates related to the liquidation of the Transitional Authority,
A further report on UNMIH(A/50/363/Add.4) concerned the revised cost estimates for the liquidation of the Mission, which was terminated as of 30 June 1996.
Requirements for UNPROFOR's proportionate share of financing of the IMIS project were decreased in the revised cost estimates contained in document A/50/696/Add.1.
my report containing revised cost estimates for UNAMIR is in preparation
Supplementary explanation of the revised cost estimates for the period from 1 July 1998 to 30 June 1999.
The revised cost estimates are lower, primarily due to the reduction in deployment to 287 person-months.
I therefore intend to submit to the General Assembly revised cost estimates for the period from 1 May 1994 to 31 October 1994 within the above-mentioned parameters.
A summary of the revised cost estimates showing the initial cost estimates,
contains a supplementary explanation of the revised cost estimates.