Примеры использования Type approval certificate на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The type approval authority of the Contracting Party may deliver the type approval certificate as soon as it holds the three required certificates. .
Enforceability: The material used for the shell is stated on the tank plate, type approval certificate and test report
Comment 2: A test report of a test which does not fulfil the requirements of ATP can also be regarded as a Type Approval Certificate.
As a general rule, measures to ensure the conformity of production with regard to CO2 emissions from vehicles are checked on the basis of the description in the type approval certificate conforming to the model in annex 4 of this Regulation.
Antennas not included in the type approval need a declaration of conformity to the type approval certificate, delivered by the manufacturer of the type approved Inland AIS station.
If the type approval certificate makes provision for restrictions on use, in accordance with article 8 bis.04,
Contracting Parties type approval authorities will not grant a type approval certificate in accordance with article 2 of the annex to the AETR.
The expert from United Kingdom suggested that the proposal should include amendments to the type approval certificate(Annex 1 of the UN Regulation)
recognized by the Approval Authority for the purpose of drawing up the type approval certificate.
recognized by the Approval Authority for the purpose of drawing up the type approval certificate.
only the tank and tank-container type approval certificate must be granted:
According to the above results, this report shall be valid as a"refrigeration unit" type approval certificate suitable for"insulated" equipment within the meaning of the provisions outlined in annex 1,
it shall require the manufacturer to take appropriate corrective measures and it shall not issue any type approval certificate or certificate of conformity.
The relevant technical requirements of Chapter 9.2 shall be considered to be fulfilled if a type approval certificate has been issued by a competent authority in accordance with ECE Regulation No. 1052 or Directive 98/91/EC3 provided
On request, the constructor shall send the authority which issued the type approval certificate, within 45 days of the end of each calendar year and immediately following any
In most cases, it would be sufficient to update type approval certificates.
Contestations of type approval certificates p 9.
full type approval is needed(functional, security, interoperability and type approval certificates) therefore the procedure might be longer.
The introduction of the use of new standards as type approval certificates expire will allow their progressive and economical introduction.
Comment: Hitherto, 6.8.2.4.6 applied only to inspections of tank-wagons not type approval certificates.