Приклади вживання River basin management Англійська мовою та їх переклад на Українською
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
alterations are specifically set out and explained in the river basin management plan required under Article 13
The summary of the register required as part of the river basin management plan shall include maps indicating the location of each protected area
Member States shall for each period to which a river basin management plan applies, establish a surveillance monitoring programme.
are specifically mentioned in the river basin management plan required under Article 13
to determine requirements for monitoring programmes in the current and subsequent river basin management plans.
Member States shall for each period to which a river basin management plan applies, establish a surveillance monitoring programme and an operational monitoring programme.
including River basin management plan according to the EU Water Framework Directive,
So, for the purpose of conservation, the Ebro River Basin Management Plan was initiated, in which the parts of the Ebro's water will be distributed equally, but still this also faced rejection by a number of critics.
(2) The reasons for those modifications or alterations are specifically set out and explained in the river basin management plan required under Article 13 of the 2003 Regulations and the objectives are reviewed every six years.
(4) The establishment of less stringent environmental objectives, and the reasons for it, are specifically mentioned in the river basin management plan referred to in Article 13 of the 2003 Regulations, and those objectives are reviewed every six years.
The programme may be amended during the period of the river basin management plan in the light of information obtained as part of the requirements of Annex II or as part of this Annex, in particular to
Member States shall provide in the river basin management plan a map showing for each groundwater body
River basin and">experts in Ukraine-Swedish project on establishing river basin management plan of Southern Bug River. .
The Dnieper River Basin Management Plan.
The Southern Bug in Ukraine received the first River Basin Management Plan- as required by the EU.
key areas of flood risk management plan in a single system of integrated river basin management.
(c) Extensions shall be limited to a maximum of two further updates of the river basin management plan except in cases where the natural conditions are such that the objectives cannot be achieved within this period.
The Danube River Basin Management Plan.
The river basin management plan shall include the information detailed in Annex VII.
The Draft Upper Dnieper River Basin Management Plan.