英語 での Purlin の使用例とその 日本語 への翻訳
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
Purlin Profile: 80 x 80 x 2mm Tent Packaging: Membrane film for long aluminum parts.
To change from C purlin to Z purlin it just needs 30 min to finish.
The bottom purlin should have 50-70mm distance from the eave.
The C Z Purlin and U purlin are used for supporting the ceiling from the ground.
Produce from C to Z purlin by switch one side roller, only need about 15 minutes.
Hanger bolt applies to install on both wooden rafter and steel purlin.
The C-type purlin produced has good straightness and good resistance to bending and bending;
Produce different stud and track(CU purlin size) without changing rollers or spacers, similar as SAMCO studmaker, but can also produce tracks.
We can design C purlin rollformer according to your specific profile drawing.
HQ mount's stainless steel hanger bolts apply to install on both wooden rafter and steel purlin.
Color steel cold roll forming machine, CZU purlin making machine and.
We there are two different types, C purlin and Z purlin.
UPVC tile installation should choose appropriate purlin spacing to prevent deformation cracking.
We often use C/Z purlin in the light building, such as factory, warehouse, market room etc.
The wall and roof are made of color steel board or color steel sandwich panels, which are connected with the purlin by Self-tapping nails.
Presently, ZHONGHENG have developed series kinds of C Purlin Forming Machine for different requirements such as.
User can achieve the C Z purlin with any length, width and any hole size.
Quick interchange C Purlin Roll Forming Machine with multifunctional cutting, Automatically adjust the sizes of C purlin, and easy to adjust the cutting blade. 2 minuter changeover time.
The Surface of the deck should be smooth,the material of the deck should be of small deformation,the deck should be more than 12mm thick(according to the purlin span).