And a large Canadian oil-sands project developed by Imperial Oil, which is 70% owned by Exxon, has been beset by cost overruns.
项目直接和间接影响更多的人的项目被证明是更容易成本超支。
Projects in which more people were directly and indirectly affected by the project turned out to be more susceptible to cost overruns.
关键是要防止ERP项目被分成许多小项目,这可能导致成本超支。
It is advisable to secure ERP projects from getting divided in small projects and it could result in the cost overruns.
项目直接和间接影响更多的人的项目被证明是更容易成本超支。
Projects in which more people where directly and indirectly affected by the project turned out to be more susceptible to cost overruns.
关键是要防止ERP项目被分成许多小项目,这可能导致成本超支。
It is important to prevent ERP projects from being split into many smaller projects, which can lead to excess costs.
安德拉德古铁雷斯没有回应美联社要求就成本超支的指控发表评论。
Andrade Gutierrez did not respond to an AP request for comment on the accusations of cost overruns.
原因,包括但不是限于、成本超支、基础结构的复杂性,有限的知识、技术的设计缺陷和性能差,"说塞拉诺。
The reasons include, but are not limited to, cost overruns, infrastructure complexity, limited knowledge, technical design shortcomings and poor performance,” said Serrano.
在无休止的一系列延误(仍在继续)和成本超支之后,总价现在看起来像它可能达到惊人的250亿美元。
After an endless series of delays(still ongoing) and cost overruns, the total price tag now looks like it may hit an eye-popping $25 billion.
For example, it indicated that the capital master plan cost overruns reported by the Administration for the period ended in March 2012 totalled $430 million(A/67/5(Vol. V), para. 15).
Over8 CEO Clare Colhoun announced“Delays and cost overruns are costing billions of dollars when the need for capital discipline has never been greater.
However, there may be cost overruns with this approach since the technical upgrade of a customized system will require the reimplementation of the system' s customizations.
Against the previously projected requirements of $68,400, actual expenditure amounted to $86,600, reflecting overexpenditure of $18,200 owing to cost overruns for locksmith services and supplies for the 380 Madison Avenue location.
The construction of the UNAMI integrated headquarters will face the traditional constraints of scope, time and cost; however, the specific measures proposed to prevent each potential cause of cost overruns and delays are described below.
English
Bahasa indonesia
日本語
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt