Report of the Secretary-General on the proposed strategic framework for the period 2012-2013: part I, plan outline, and part II, biennial programme plan(A/65/6(Part one and Progs. 1-27)).
Report of the Secretary-General on the proposed strategic framework for the period 2016-2017: part two, plan outline, and part two, biennial programme plan(General Assembly resolutions 62/224, 67/236 and 68/20).
Proposed strategic framework for the period 2008-2009: part one: plan outline(A/61/6(Part One)) and part two: biennial programme plan(A/61/6(Prog. 1-13, 14/Rev.1 and 15-27)).
The Committee recommended that the General Assembly review the plan outline(Part One) of the proposed strategic framework for the period 2008-2009 so that it more accurately reflected the longer-term objectives of the Organization.
At its 7th meeting, on 4 June 2014, the Committee considered part one, plan outline, of the proposed strategic framework for the period 2016-2017(A/69/6(Part one) and Corr.1).
The Committee recommended that the General Assembly review part one, plan outline, of the proposed strategic framework for the period 2006-2007(A/59/6(Part One)) at its fifty-ninth session.
At its 5th and 17th meetings, on 6 and 14 June 2012, the Committee considered part one, plan outline, of the proposed strategic framework for the period 2014-2015(A/67/6(Part one)).
The view was expressed that the promotion of a culture of responsibility within the Secretariat, in line with General Assembly resolutions 59/275, 61/235, 62/224, 63/247 and 64/259, could have been better reflected in the plan outline.
At its 7th meeting, on 4 June 2014, the Committee for Programme and Coordination considered part one, plan outline, of the proposed strategic framework for the period 2016-2017(A/69/6(Part one) and Corr.1).
Results The mission allowed the National Emergency Commission and UN-SPIDER staff to outline the plan of action to be implemented by the Commission in institutionalizing the use of space-based information.
The plan outline contained in part one was welcomed as a succinct, clear and readable document, reflecting longer-term objectives and the values of the Organization.
Report of the Secretary-General on the proposed strategic framework for the period 2008-2009: part A, plan outline, and part B, biennial programme plan(para. 5 of General Assembly resolution 59/275).
有人对在计划大纲中提到一些原先并无大会核可授权的具体概念表示疑虑,特别是有关"保护责任"的概念。
Concern was expressed about references to specific concepts within the plan outline for which no prior General Assembly mandates had been approved, in particular with regard to the" responsibility to protect".
Confirmation was sought on whether the methods used to address" new challenges" and" management reforms", referred to in paragraph 37 of the plan outline, would be implemented with the prior consent of Member States.
(b) Proposed strategic framework for the period 2014-2015: part one: plan outline(A/67/6(Part one)) and part two: biennial programme plan(A/67/6(Progs. 1, 2 and Corr.1 and 3-28));
计划大纲.
Plan outline.
A部分:计划大纲.
Part A. Plan outline.
第一部分:计划大纲.
Part one: plan outline.
离岛议会分区计划大纲的.
Outline Zoning Plans with Islands District Council.
候选人研究计划大纲(一页).
Outline of the candidate's research plan(one page).
English
Bahasa indonesia
日本語
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt