Lead time is also 89% shorter, with outsourcing taking an average of 35 days, and 3D printing just 4.
Processing Lead Time: It is the time required to procure or manufacture an item.
The Focal Point for Electoral Assistance instructed UNDP to inform the Government that, due to insufficient lead time, the United Nations was not in a position to send observers.
Comparison of latency and bandwidth Feedback Interrupt latency Jitter Lead time Memory latency Performance engineering Response time(technology) Responsiveness Throughput.
The company's goal was to reduce lead time while maintaining fill rate and avoiding backorders or lost sales.
This move will significantly reduce the lead time and allow the Mission access to its goods in a shorter time frame.
In the traditional printing field, the operating cycle and production lead time continue to decrease, while the workload continues to grow.
Increased development of global systems contracts to cover 90 per cent of fleet spare parts inventory, to reduce vehicle downtime and spare parts lead time.
If the printed parts require tooling, lead time may increase up to one or two weeks.
This course of action would have significantly increased the costs of the United Nations and the lead time in mobilizing other construction capabilities in Darfur.
A dedicated launch will cost customers $4.9 million, and only requires a lead time of a few weeks.
The lead time of injection mould is one of the important conditions for the early launch of the product.
In the field of digital printing, the operation cycle is extended, the production lead time is shortened, and the workload is increasing.
Yes UNSOA implemented a minimum-maximum stock level driven by demand rates, lead time and service levels to reduce and improve management of surplus assets.
Umoja processes allow access to real-time global data, benefits of consolidation(such as volume discount) and reduced lead time.
Lead time is also 89% shorter, with outsourcing taking an average of 35 days, and 3D printing just 4.
UNHCR re-emphasizes to supply officers in the field that the lead time for medical supplies be no longer than four to six months.
Short Lead Time: Single-layer boards can be manufactured quickly due to their simplicity and the fact that they require fewer resources than multi-layer PCBs.
As a control measure, requisitioners are always required to take into consideration stock levels and procurement lead time when raising requisitions.
It was below the critical point, indicating that the lead time of manufacturing raw material suppliers has slowed down.