Examples of using Trolley in English and their translations into Chinese
{-}
-
Political
-
Ecclesiastic
-
Programming
Hospital Infusion Trolley.
Tram and Trolley.
Next, build the trolley.
Take a Cody Trolley Tour to see the Buffalo Bill Reservoir, Crow Indian territory, pioneer homes and the historic district.
Some of the eight or ten people waiting at the trolley stop were going to work.
Durable: Electric trolley fully consider the site of all complex road conditions, so we build cars, not stingy use of steel, durable.
Even if they don't or won't encounter problems as simplified as the trolley and footbridge examples, AI systems must embed some kind of ethical framework.
High efficiency: Electric trolley load is equivalent to the average human lorries three times times, efficient workers.
The trolley was hit by the train, but there was no serious damage to the vehicle or injuries on board.
Trolley and cable car are usually not included in the day trip, need to tourists at their own expense.
For city trolley and bus schedules and routes please call(619) 685-4900.
Easy to control: Electric trolley operation is simple, workers learn to operate within 10 minutes, no need for special training.
The difference is that Oscar's hiker is not being used to stop the trolley: he is collateral damage, as in Denise's dilemma.
The Old Town Trolley Tour is one of the best ways to see St. Augustine because they cover the entire city.
The Street View trolley has been used to map 200 museums, including photos of 40,000 works of art.
Therefore, the"big horse-drawn trolley" is serious, long-term operation under low load, causing a great deal of waste.
The difference is that the front of the mountain auxiliary tool is a trolley, after the mountain auxiliary tool is a cable car.
There is also quick access to many bus and trolley lines that will provide you access to many parts of the city.
Bicycles are not allowed to turn left from the outside of the road trolley roundabout, straight road not allowed to use the right turn method.
The bridge travel, trolley travel and spreader lift were given new drives, while the remaining electrical systems were integrated for operation through the PLC.