Examples of using Test system in English and their translations into Croatian
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
The ultrasonic wire cleaning test system is versatile
automatic adjustment& test system(for transceiver optics),
Transformer oil BDV test equipment Insulating oil dielectric strength tester Features 1. Automatic test system, safe and clean.
temperature and humidity test system;
HZ-139S three-phase Primary Current Injection Test System with aluminum alloy chassis, PC panel, beautiful appearance;
Difference between variable frequency series resonant test system and induction power frequency resonant test set.
High voltage test system Urms=350 kV, 50 Hz for HV test and partial discharge measurement.
The UNHT³ HTV high-temperature nanoindentation tester is a low-load nanomechanical test system for measuring the hardness and elastic modulus of thin films and coatings up to 800 °C.
WDR will distribute their content through 5G test system, that Vodafone intends to use for the first time directly to the television broadcasting.
other solvent that has been demonstrated to have no adverse effects on the test system.
There is nothing we can do with it. If we want to verify it, a test system has to be set-up
other solvent that has been demonstrated to have no adverse effects on the test system.
HZJB-1600 Relaytestar 6 phase secondary injection relay test system High-Performance Industrial Control Computer High performance Industrial control computer is adopted as the controlling computer,
HZJB-1600 Relaytestar 6 phase secondary injection relay test system High-Performance Industrial Control Computer High performance Industrial control computer is adopted as the controlling computer,
HZJB-1600 Relaytestar 6 phase secondary injection relay test system High-Performance Industrial Control Computer High performance Industrial control computer is adopted as the controlling computer,
We test peak power draw from our test system by disabling the Core i7 overclock on our test system, then manoeuvring to the end of the Welcome to the Jungle stage in Crysis 3, running the game maxed at 2560×1440 resolution.
Besides that, PQCC will use the photovoltaic systems as test system for testing the power quality, impact on the network, measuring and testing the parameters
which provides a low-cost automated test system.
a concurrent solvent/vehicle control group is included in the test method to detect non-specific changes in the test system, and to ensure that the assay conditions do not inappropriately result in an irritant response.
entrusted to us as a processor will be permanently erased 90 days after the test system is closed(during this period you can start subscription without re-recording your data recorded in the test system). .