Examples of using Is scheduled to start in English and their translations into Japanese
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
March 26: Tokyo Olympic torch delay is scheduled to start from Fukushima prefecture.
Manufacture of the first production model of the I.D. family is scheduled to start at the end of 2019 in Zwickau, Germany.
The clinical trial is scheduled to start after the PMDA's 30-day review period.
March 26: Tokyo Olympic torch delay is scheduled to start from Fukushima prefecture.
Post time the time at which a horse race is scheduled to start.
The company is scheduled to start production at its third plant in Thailand in March 2012(Note 1).
Fusion reactor'' artificial sun'' capable of producing 200 million degree plasma is scheduled to start operation in 2020-gigazine.
The SUV plant, whose cornerstone laying ceremony was held in July 2012, is scheduled to start operations in 2014.
Volume production of the first data flash memories is scheduled to start in the second half of 2003 in Dresden.
A second ship of the Dream Cruises fleet- World Dream- is scheduled to start operations in November 2017.
The Office 2010 download installation service for university-own computers is scheduled to start on June 21(Monday).
GMO CLICK Bullion Limited is scheduled to start offering financial services to traders in Hong Kong at the end of December, 2013.
The Hong Kong line is scheduled to start from the 27th and the Singapore line from March 2nd.
Transcosmos inc. is scheduled to start customer support operations for“Mizuho Messenger,” the next-generation channel developed by Mizuho Bank, Ltd. in November 2014.
Investment will amount to 1 billion rupees(approximately 1.9 billion yen at a rate of 1 rupee/1.9 yen), and the line is scheduled to start operation in November 2012.
The Company will construct a natural gas-fired combined cycle power generation plant with a power generation capacity of 1,100 MW in Dutchess County, New York. The power plant is scheduled to start commercial operation in 2020.
The Ichishiro Hydroelectric Power Station will be a maintenance flow discharge power station with a maximum output of 160kW. Construction is scheduled to start in FY2020 and the start of commercial operations in FY2021.
Following the Guinness-acknowledged Unit 7-1, constructions based on the same specifications are underway at Unit 7-2, the commercial operation of which is scheduled to start in late March 2018.
Unity is scheduled to start operation in 4Q 2009(January- March 2010). The Unity cable system, approximately 10,000 kilometer(km) long in total, will link Japan and the United States directly.