Examples of using Pressure test in English and their translations into Polish
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Financial
-
Official/political
-
Programming
-
Computer
the instrument will automatically complete the pressure test of the oil sample.
Pressure test: The purpose of the test is to provide evidence that the hydrogen containing components can withstand a pressure,
the products pass the pressure test if there are disruptive discharge happened.
coloring and pressure test.
The pressure test is planned to be performed on September,
After the pressure test the admissible operating pressure is kept by shut off of the respective pipe.
On Tuesday, 17 January 2012 Mostostal Puławy carried out successful pressure test of the fluid bed boiler at the heat and power plant in Örebro, Sweden.
The pressure test is planned on November 26th,
On Thursday, 1 December 2011 Mostostal Puławy successfully carried out a pressure test of a soda recovery boiler at the construction site in the paper plant in the city of Iggesund in Sweden.
On Monday, 12 March 2012 Mostostal Puławy carried out successful pressure test of the power boiler in Kyröskoski, Finland.
The material properties of the aquatherm PP-R pipe systems result in an expansion of the pipes during the pressure test.
allows to perform a pressure test before the installation of the measurement equipment.
On May 25th, 2010 took place the positive hydrostatic pressure test of the boiler on technological line No 1 in Roosendaal, the Netherlands.
Insulated boots and gloves pressure test, a period of six months,
The instrument is simple operation, the operator can make simple set, the instrument will automatically set the complete 1 cup of oil pressure test.
When the test time is up, the alarm light on the pressure test bench flashes and an alarm sounds.
an electrolyte panel, a blood pressure test and a urinalysis, so as to rule out other causes of disease.
On July 23rd, 2010 took place the positive hydrostatic pressure test of the boiler in the incineration plant EGE Oslo in Norway.
On Thursday, 1 December 2011 Mostostal Puławy successfully carried out a pressure test of a soda recovery boiler at the construction site in the paper plant in the city of Iggesund in Sweden.
which can conduct two sections of insulation at a time Rod pressure test.