Examples of using New terminal in English and their translations into Portuguese
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Official/political
The project aims to develop 19 new intermediate stations(elevated stations) and a new terminal in Tepexpan at grade station.
Transport and telecommunications projects attracted ECU 463.5 mil million for α new terminal building at Frankfurt Airport and another 52 million for construction of the new Munich international airport.
After the new terminal opened, domestic flights were moved to the old international terminal. .
International airport Simferopol International Airport's new terminal opened in from April 2018 with the ability to handle 6.5 million passengers a year.
including the construction of a separate new terminal between the Zwanenburgbaan and Polderbaan runways that would end the one-terminal concept.
The new prospect of a brand new terminal was granted,
We intend, from 2012 onwards, to operate in our own, new terminal, with 60,000m2, located in an area in the Cocaia Island.
FIX: User is prompted for password when opening new terminal from a connected session.
From the RP3, enter to the left for a wide street on which the rural police and the new Terminal of Bus are located.
joint check-in desks at Stuttgart Echterdingen Airport's new Terminal 3.
internationally is the brand new Terminal 2 in Mumbai.
In 2008, the Egyptian Airports Holding Company announced plans to build a third new terminal at the airport.
Coffey was awarded the works for the construction of the new Terminal 2 at the Dublin Airport in Ireland.
Two new terminals were to be built within the next several years which would bring the total capacity of the airport to 20 million- the first new terminal was due to open by March 2011.
European Air Transport Leipzig GMBH has awarded SANJOSE Constructora the execution of the new terminal building of DHL in the loading centre of the Airport of Adolfo Suárez Madrid- Barajas.
Ii the construction of a completely new terminal so as to increase the overall terminal capacity(including the existing one) by 350%, bringing it up to 18 million passengers per year;
Which began operating in early June, this new terminal will house all 23 Star Alliance member airlines that serve the UK's only hub airport, including TAP.
TAP has great expectations from this move to Heathrow's new terminal, as it will not only considerably improve operational conditions
including a brand new terminal at Plaza de los Virreyes.
Within the established objectives, the new terminal will have the highest standards of sustainability in order to achieve LEED Platinum certification, which will make it the first new terminal in the world to achieve this.