Examples of using Voltage test in English and their translations into Romanian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Programming
(1) The DC withstand voltage test cannot simulate the actual operating conditions of rubber cables.
Therefore, the transformer may pass the 1min withstand voltage test, but the operation reliability cannot be guaranteed.
Next: Why do we use vlf hipot test replace power frequency withstanding voltage test?
feasible to carry out the AC withstand voltage test on the cross- linked cable in the field.
Power frequency withstand voltage test, pay attention to check whether the equipment capacity is sufficient,
Power frequency without partial discharge test transformers should be precautions before AC withstand voltage test- Domain Knowledge- Huazheng Electric Manufacturing(Baoding) Co., Ltd.
Hot Tags: high tension line stringing tools for high voltage test, made in China,
Product Description: coupling capacitor is used for detecting partial discharge signal during no partial discharge voltage test.
Next: Power frequency without partial discharge test transformers should be precautions before AC withstand voltage test.
The power frequency AC withstand voltage test plays a decisive role in assessing the main insulation strength of the transformer
so the induction withstand voltage test is required.
In many cases, the DC voltage withstand test cannot quickly detect the presence of a cross-linked cable as in the AC withstand voltage test.
Power frequency without partial discharge test transformers should be precautions before AC withstand voltage test.
Since the AC withstand voltage test of the fully insulated transformer is tested,
This high voltage test instrument is an indispensable assistant in quality control- for goods inwards inspection as much as in production or servicing.
Step 4: Connect group voltage test line to the two poles of battery string.
Transformer induction voltage test is to ensure that the quality of the transformer in line with national standards of an important test. .
Second Step: Connect group voltage test line to the two poles of battery string(see the details in section 2.5).
such as high voltage test, nearby switch operation,
Before conducting the AC withstand voltage test, various non-destructive tests must be carried out, such as measuring insulation resistance,