Examples of using Are shown in column in English and their translations into Russian
{-}
-
Official
-
Colloquial
Expenditures for the period from 1 July 1998 to 28 February 1999 are shown in column 3.
Data from the survey mentioned above on domestic resource flows for family planning6 are shown in column D of the table.
Liquidation costs of UNPREDEP during the period from 1 March to 30 June 1999 are shown in column 4.
budget line item and the actual expenditures are shown in column 4.
The total requirements for the 12-month period from 1 July 1998 to 30 June 1999 are shown in column 2.
The unliquidated obligations are shown in column 6, and savings
The expenditures recorded for the period amount to $124,257,400 gross($121,666,600 net) and are shown in column 2.
the actual expenditures are shown in column 5 and result in an unencumbered balance of $385,300 gross $213,700 net.
the actual expenditures, are shown in column 4 and result in an unencumbered balance of $1,129,300 gross $1,066,700 net.
type approval(TA) requirements of 6.8.4 which are shown in Column(13) of Table A in Chapter 3.2 for those substances for the carriage of which the tank has been approved.
the actual expenditures are shown in column 4 and result in an unencumbered balance of $2,863,500 gross $2,679,700 net.
while requirements for the liquidation period, from 1 December 1999 to 30 June 2000, are shown in column 5.
additional requirements to cover the cost of full deployment of the Mission are shown in column 3.
totalling$ 370 million as at 1 August 1998, are shown in column 3 of the attached Annex I.
type approval(TA) of 6.8.4 which are shown in column(13) of Table A of Chapter 3.2 for those substances for the carriage of which the tank has been approved;
additional requirements to cover the cost of the full deployment of the Force are shown in column 3.
the alphanumeric codes of all special provisions TC and TE which are shown in column 13 of Table A of Chapter 3.2 for the substances to be carried in the tank;
The budget estimates for the period from 1 July 1997 to 30 June 1998 are shown in column 2, while columns 3
while the requirements for the initial mandate period from 15 April to 30 June 1998 are shown in column 3, with the breakdown into non-recurrent
the total revised cost estimates are shown in column 5.