Examples of using Were drilled in English and their translations into Russian
{-}
-
Official
-
Colloquial
From the beginning of the year, 686.3 ths m of rock were drilled and 142 new wells were put into operation at the Company fields.
At year-end 2016, 73 production wells were drilled at the South-Tambeyskoye field, exceeding the well
From the year beginning 194.1 ths m of rock were drilled and 39 wells were put into development at the Company's fields.
As at the year-end, 103 production wells were drilled at the South-Tambeyskoye field, surpassing the mark
Following two vertical exploration wells, four horizontal wells were drilled during the pilot phase that each run horizontally over about 1,000 meters.
That is, the production from wells that were drilled after 1 January 2018 will be taxed according to these rates,
27 wells were drilled in the Sudan.
because they were both naked and were drilled, after the European and American countries have adopted. China is referred to as" gymnastics.
Sixty deep wells were drilled in drought-affected areas for irrigating orchards and watering livestock.
303 in the West Zhagabulak area, which were drilled about five years ago,
similar to that of wells J-51 and J-52 which were drilled on the same structure.
At year-end 2015, 41 production wells were drilled at the South-Tambeyskoye field, representing approximately 70%
The exploration drilling progress amounted 32 ths m under the year-end results; 11 wells were drilled up.
Long rectangular strips were gathered on top of one another, holes were drilled through all the leaves, and the book was held together by string.
The latter were drilled ahead of the face and inevitably some suffered damage
But during the final installations, some tendons were drilled into, where drilling wasn't permitted.
In preparation for construction, 34 concrete and steel caissons were drilled 120 feet(37 m)
Gas condensate Wells 404 and 406 were drilled using the same successful directional drilling technology previously applied for Tournaisian oil production wells in the north-eastern block.
South-2bis NS-1 underground wells were drilled using trajectory control on the pressure gauge.
From the outset, Desoutter needed to develop specific pneumatic tools to ensure that the aluminum components of the artificial limbs were drilled efficiently.