Voorbeelden van het gebruik van Permit conditions in het Engels en hun vertalingen in het Nederlands
{-}
-
Official
-
Colloquial
-
Ecclesiastic
-
Medicine
-
Financial
-
Computer
-
Ecclesiastic
-
Official/political
-
Programming
in determining permit conditions, particularly as regards emission limit values.
prior to the commencement of deposition operations there must be an inspection to check that the permit conditions have been complied with.
which provide European level sector benchmarks on what constitutes BAT when setting permit conditions.
allow Member States to achieve BAT-based emission levels through an emissions trading system based on EU rules instead of individual BAT-based permit conditions for NOx and SO2.
above issues are addressed consistently, by establishing common permit conditions, a common condition on transfer of responsibility to the state,
shall set the permit conditions accordingly.
the updating of a permit or of permit conditions; for the purposes of this definition, non-governmental organisations promoting environmental protection
That the operator provides the competent authority with a report on compliance with the permit conditions at least every twelve months;
The permit conditions, including emission limit values(ELVs),
enable the competent authority to verify compliance with the permit conditions and Article 64.
The results of monitoring of releases as required under the permit conditions referred to in Article 9 and held by the
The results of monitoring of releases as required under the permit conditions referred to in Article 9 and held by the
Secondly, it may be necessary to lay down permit conditions for some greenhouse gases other than carbon dioxide,
When setting the permit conditions based on best available techniques(BAT),
An important point of debate is whether compliance with permit conditions shall be deemed to be a legitimate defence for operators of IPPC installations
Permit conditions must be based on best available techniques BAT.
Routine inspections shall ensure that the operator complies with the permit conditions.
BAT reference documents shall be the reference for setting the permit conditions.
Where appropriate, the competent authority shall update the storage permit or the permit conditions.
Permit conditions are already generally very stringent.