Примери за използване на Overhead contact на Английски и техните преводи на Български
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
If the simulation results are acceptable, a site test shall be made using a representative section of one of the overhead contact lines used in the simulation;
The simulations shall be made using at least two different TSI compliant(2) overhead contact lines for the appropriate system, at the design speed of the Pantograph.
the interaction of overhead contact line and pantograph represents a very important aspect in establishing reliable power transmission without undue disturbances to railway installations
On the specific high-speed line Paris to Lyon, a modification of the overhead contact line is necessary to provide for the permissible uplift without uplift stops installed in the pantographs.
A new design of overhead contact line shall be assessed by simulation according to EN 50318:2002
For DC 1,5 kV systems, the overhead contact line shall be designed to withstand a static contact force of 140 N per pantograph
Assessment procedures for conformity of the interoperability constituent overhead contact line as defined in chapter 5 of this TSI, are indicated in Annex B, Table B.1 to this TSI.
The interoperability constituent overhead contact line consists of the components listed below to be installed within an energy subsystem
A new design of overhead contact line shall be assessed by simulation according to EN 50318:2002
In the case of high-speed rail systems, an overhead contact line with catenary suspension is applied where the contact wire(s)
The design of structures shall take into account the space necessary for the passage of pantographs in contact with the overhead line equipment and for installation of the overhead contact line itself.
Power supply and overhead contact system.
Power supply and overhead contact system.
Particular assessment procedure for the interoperability constituent- overhead contact line.
Dismantling of sections of dysfunctional overhead contact line(OCI) of trolley transport- Plovdiv city.
part of the mechanical Overhead Contact Line elements by elements in conformity with the TSI.
validation of measurements of the dynamic interaction between pantograph and overhead contact line.
The aim is to preserve the electrical equipment, the overhead contact network(OCN), the power supply cables, and the trolley buses.
If the simulation results are acceptable, a site dynamic test with a representative section of the new overhead contact line shall be undertaken.
traffic lights was also conducted, and the street lighting and the overhead contact network were renewed.