Both That Summer and Water Tax, by critiquing the present through the actual lives of farmers and workers, are critical films that deal with the type of taboo matters that had yet to be treated by any other documentary film prior to this moment.
In deploying micro hydro such as, ensuring stable flow volume throughout the year, impacts on the city landscape, concern about noise pollution among residents living near power generation facilities, and negotiations concerning water rights and river management.
酒田を拠点に富を築き、かつて日本一の大地主と言われ、商売や公共・水利事業にも取り組んだ。
The Honma clan that created vast riches in Sakata was once said to be the largest landowner in Japan and applied their talents and energy to public works and water projects as well as to business.
Zhejiang Province, the oldest large-scale water conservancy construction- thomas weir, located 28 kilometers southwest of the city in 1981 was listed as provincial-level units to be protected.
By the 1970s almost all the water rights were sold from what is now called the Twin Lakes Canal to the fast-growing cities of Colorado's Front Range corridor.
Nevertheless, the Ministry of Water Resources and its affiliated river basin commissions in all major river basins are key players in water resources management.
At that time, I think of Dujiangyan, and the water conservancy project, are both part of the human to use their own wisdom, a gift of nature to be full advantage of results.
Communications and water conservancy, energy facilities will also strengthen The reporter was informed that Chengdu will also strengthen communication and water conservancy, energy facilities.
An Act of Parliament formed the Lynmouth& Lynton Lift Company in 1888, and a further Act gave the company perpetual rights to the water from the Lyn Valley.
Last year, Amnesty International reported on the extent to which Israel's discriminatory water policies and practices are denying Palestinians their right to water.
In 1881, the Chaffey brothers, William, purchased the land(which at that time also included the present-day city of Upland) and the water rights to it.
Circumstances Leading to the Dam Removal Before the water rights allocated to the prefecture expired in March 2003, Kumamoto Prefecture discussed their renewal, because the water rights were necessary for continued hydropower generation.
It sa weir It(the sound"drag"), Mountain weir is Dujiangyan, Zheng Qu, ling qu par four major water conservancy projects in ancient China, the National key cultural relics protection units.
China, which is building multiple dams on all the major rivers running off the Tibetan plateau, is likely to emerge as the ultimate controller of water for nearly 40% of the world's population.
Two thousand years ago, a named Li Bing, prefect in the Minjiang River in Sichuan are about to enter the edge of the Chengdu plain where until today the completion of the amazing ancient water conservancy projects- Dujiangyan.
After the decision was made to remove the dam, its gates were opened on a regular basis. When the gates were fully opened in April 2010 after the water rights expired, the river gradually returned to its original condition and its water quality improved.
Comprehensive solutions for better water utilization Valmet's comprehensive water management solutions include process optimization, process evaluation and feasibility studies, and water concepts for lowering fresh water consumption in the production of various paper grades.
In 2007 the Yellow River Conservancy Commission, a government agency, surveyed 13,000 kilometres(8,000 miles) of the river and its tributaries and concluded that a third of the water is unfit even for agriculture.
English
中文
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Bahasa indonesia
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt