英語 での This check box の使用例とその 日本語 への翻訳
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
Automatic layout space name: Select this check box to determine the highest existing layout space number for the project, and to suggest the next highest number/ numbers for the Layout space name column.
In R 7.1.3, if a check box is included in the list update screen, if this check box is validated and saved, it is regarded as"deletion mark" and the data disappears.
Overview of the main dialog elements: Use graphical macro selection: If this check box is activated, the graphical macro selection is used at all positions in the EPLAN platform where macros are selected.
In this example, this check box is irrelevant, because neither the PrimaryKey field in the source XML nor the PrimaryKey field in the database contains any null values.
If each line in the key column contains a unique value, the key column is a unique key colulmn, and this check box can be set to optimize the speed of the Join operation.
Combine parts of a device: Activate this check box if the parts at terminals are to be combined into terminal strips and the parts at cable connections are to be combined into cables in the parts list.
If you have already selected a single project(and not set any filters), then this check box is automatically activated and grayed-out.
If the STEP file contains assemblies whose bodies were combined into one unit by the generating CAD system, all combined bodies are generally separated- independent of the setting of this check box.
select this check box.
Overview of the main dialog elements: Preview: Select this check box in order to display, on the right side of the dialog, the graphical preview of the macro selected in the list on the left side of the dialog.
In a Schematic project you can only make settings for the handle Overview of the main dialog elements: Generate protected group during insertion: Activate this check box if a protected group is to be generated during insertion of the macro.
If no subdirectory is stored in the data backup, this check box will be grayed out. If you want to use the subdirectory but it does not exist, a prompt appears, asking if you want it to be created.
Overview of the main dialog elements: Number manual cables first: If this check box is selected, manual cables(cables on which the cable definition line is not automatically placed) are numbered first.
Overview of the main dialog elements: Generate symbolic addresses automatically using: If this check box is selected, then you can use the following check boxes to define which identifier blocks are used to automatically create symbolic addresses.
Placeholder object/ Macro box: Adopt part number without synchronizing parts: If this check box is activated, the Conflict dialog is not displayed for the value set assignment via a placeholder object/ macro box, and no data are transferred from the parts management.
Delete missing objects in the project during re-import: If this check box is activated, segments that are missing during a renewed import in the data source, i.e. were removed, are displayed in the subsequent dialog Synchronize pre-planning data and identified as deleted.
If this check box is activated, the Sync Action column provides a drop-down list where you can choose a synchronization action for an individual file or sub-directory and thus override the settings that have been defined on directory level.
Overview of the main dialog elements: Place macros again: If this check box is activated, the placements of the macros entered at the marked planning objects/ PCT loops are deleted and these macros are placed again.
Modification allowed during selection: If this check box is selected, existing parts in the parts management module are modified and new parts are created when you select a part on the Parts tab of the Properties dialog for components.
Overview of the main dialog elements: Adopt connection point designation: If this check box is activated, the connection point