在 英语 中使用 Initial operational capability 的示例及其翻译为 中文
{-}
-
Political
-
Ecclesiastic
-
Programming
The AIM-260 is scheduled to begin flight-testing in 2021 and achieve initial operational capability in 2022.
The F-117A's first flight was in 1981, and it achieved Initial Operational Capability status in October 1983.
The US Alaska-based National missile defense system attained initial operational capability in 2004.
The attainment of EUFOR initial operational capability will enable MINURCAT to deploy and undertake mandated activities, beginning in Abéché.
Upon the deployment of those 19 satellites, BD-3 will possess the initial operational capability and serve the countries along the Belt and Road.
In early December, the Air Force declared initial operational capability of the nine F-35s now in its possession.
EUFOR Chad/Central African Republic announced its initial operational capability on 15 March, marking the official beginning of its 12-month mandate.
The AGS system is expected to reach initial operational capability in the first half of next year.
The JL-2 is expected to reach initial operational capability(IOC) between 2009-2010.".
Each could carry 12 JL-2 missiles, which after a decade of development“appear to have reached initial operational capability.”.
During his tenure, the program completed P-8A initial operational testing and evaluation, initial operational capability and full-rate production milestones.
An AT-X derivative would need to wait until the original trainer requirement is satisfied, and T-X initial operational capability isn't due until 2024.
Having achieved initial operational capability, EULEX deployed Kosovo-wide without incident on 9 December.
The GPS system received its IOC(Initial Operational Capability) in December 1993 and FOC(Final Operational Capability) in April 1995.
The E-2D was cleared for full rate production(FRP) in February 2013 and achieved Initial Operational Capability(IOC) on October 10, 2014.
The report also suggested that China's first domestically designed and built aircraft carrier would likely reach initial operational capability by 2020.
The first F-35I combat squadron is expected to achieve initial operational capability in 2018.
By December 1993, GPS achieved initial operational capability, indicating a full constellation(24 satellites) was available and providing the Standard Positioning Service.
With the first aircraft set to be delivered to Randolph Air Force Base, Texas, in 2023, initial operational capability(IOC) is scheduled for 2024.
The Mark 48 ADCAP Mod 7(CBASS) torpedo is the result of a Joint Development Program with the Royal Australian Navy and reached Initial Operational Capability in 2006.