Examples of using Planning accuracy in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Annex II contains an analysis of the statistics, including the overall and average utilization factors, and a breakdown in terms of percentages of the meetings ratio and planning accuracy factor of the bodies in the sample.
Annex II contains an analysis of the statistics, including the overall utilization factor, and a breakdown in terms of percentages of the meeting ratio and planning accuracy factor of the bodies in the sample.
Proactive planning of the biennial calendar at the time of preparing the semiannual projections of meetings, and through periodic monitoring of any changes to the programmes of work, has led to an increase in the planning accuracy factor(see supplementary information, sect. II, table 5).
Annex II contains an analysis of the statistics, including the overall utilization factor, and a breakdown in terms of percentages of the meeting ratio and planning accuracy factor of the bodies in the sample.
the Committee considered that the utilization factor(UF) was a complex index that incorporated all the aspects of the meeting ratio(MR) and the planning accuracy factor(PAF) and included utilization of meeting time as a factor as well.
With the exception of the Special Political and Decolonization Committee(Fourth Committee), the planning accuracy factor had also declined for the Main Committees and for the plenary over this period.
meeting ratio(table 4) and planning accuracy factor(table 5) by number and percentage of sessions and by number and percentage of meetings(table 6).
Thus, in 2005, 79 per cent of the bodies had a planning accuracy factor of 80 per cent and above, a 2 per cent improvement over 2004.
PAF Planning accuracy factor, calculated as meetings planned, minus additional meetings, minus cancellations, all as a percentage of meetings planned(A minus B minus C as a percentage of A).
Committee in previous years: the meeting ratio, the planning accuracy factor and the utilization factor.
It had also noted that the planning accuracy factor had improved by 5 per cent over the 2005 reporting period and that the overall time lost owing to late starts and early endings had decreased.
If services were provided on a more predictable basis, the calculation of the Utilization Factor, Planning Accuracy Factor and Meeting Ratio may be introduced for these groupings as is done for calendar bodies.
the Organization must accommodate the needs of each body, while not being too lenient, and that planning accuracy should be taken into account.
Underutilization of conference-servicing resources resulted in some cases from meetings being cancelled too late to schedule another meeting into the time slot, often a sign that planning accuracy could be improved.
At the United Nations Office at Nairobi, the decrease in the planning accuracy factor from 96 per cent in 2010 to 93 per cent in 2011 stems from the fact that the secretariat of the United Nations Environment Programme(UNEP)
Planning accuracy factor(percentage) Note: In 2009, 79 per cent of the sessions of the bodies had a planning accuracy factor of 80 per cent or higher, which is 11 percentage points less than reported in 2008 but 3 percentage points higher than in 2007.
Notes that the overall utilization factor at the four main duty stations, while still above the established benchmark of 80 per cent, decreased from 85 per cent in 2005 to 83 per cent in 2006, although the planning accuracy factor improved by 5 per cent over the 2005 reporting period;
Proactive planning by calendar bodies when preparing the semi-annual projections of meetings, together with periodic monitoring of planned meetings for any changes to the programmes of work, has led to a significant increase in the planning accuracy factor(see supplementary information, sect. II, table 5).
the Committee considered that the utilization factor(UF) was clearly superior as an overall measurement of utilization to both the meeting ratio(MR) and the planning accuracy factor(PAF) and should thus be kept as the primary index.
The Chairman noted that utilization had improved somewhat with greater discipline and planning accuracy but, in the case of persistent underutilizers, more radical solutions, such as a revision of the planned number of meetings based on actual past utilization, might be necessary in order to reduce chronic waste.