Examples of using Total construction in English and their translations into Arabic
{-}
-
Colloquial
-
Political
-
Ecclesiastic
-
Ecclesiastic
-
Computer
The main venue of the exhibition hall adopts a column-free structure design with a total construction area of 55,800 square meters, a building height of 22.65 meters, and an indoor exhibition area of 26,600 square meters.
The complex is built over a land area of 27.650 m² with total construction area of 85.000 m² forming 30 blocks and consisting of 420 residential units and 83 commercial units.
The project is constructed over a land area of 72.707 m² with a total construction area of 244.305 m² forming 11 residential blocks with a total of 941 residential unit and 27 commercial unit.
The project is built over a land area of 19.000 with a total construction area of 93.600 m², 7.500 m² commercial area and 13.000 m² of landscape.
The project is built over a land area of 39.561 m² with a total construction area of 362.584 m² forming 8 residential blocks consisting of 2.638 residential and 102 commercial units.
The complex is built over a land area of 105.000 m² with a total construction area of 350.000 m² forming 8 residential blocks with a total of 2.500 residential units and 100 street shops down the project.
Total construction, Baghdad.
Estimated total construction cost.
Total construction work in progress 2008-2009 under General Fund.
External gross: The share that an apartment takes from the total construction site.
It not only saves time and management cost, but shortens the total construction period.
GE Oil & Gas Expansion Project Total construction area is 13131 m2 in Dammam 2nd Industrial City.
The share of total construction area including parking lot, warehouse and social facilities is added.
Total construction costs of such dwellings(including the cost of land) are calculated at about 140,000 guilders.
With a total construction area of 80640.1 m2, a total covering area of 34476.8m2,
UNDP has told the Board that formal undertakings have been received from Agencies to meet approximately $13.5 million of the total construction costs.
They represent 50- 80 per cent of total project capital expenditure, and infrastructure represents 20- 35 per cent of total construction spending.
Our project with a total construction area of 138.000 m² is consisted of 667 residence, 125 commercial units and 198 offices.
Project of buildings and logistics services(total construction area 33073 m 2) for Almajdouie logistics company in the second industrial city of Jubail.