Examples of using Drying time in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
Quick installation, no drying time required.
Quick application, no drying time needed;
Drying time: from six to eight hours.
Average drying time is around 20 minutes.
Drying time: approx. five days.
When in doubt, select a shorter drying time and conduct a visual and manual check towards
The precious olive wood, with a drying time of at least 8 months, is prefabricated by hand.
You will get a better result if you turn the oven off after half the drying time.
Product details Olive WoodThe precious olive wood, with a drying time of at least 8 months, is prefabricated by hand.
Allow for adequate drying time.
This method further shortens the drying time.
Floor drying time min.
Drying time for different timber.
Hours without drying time.
Complete drying time- 12-14 hours.
Drying time for cleaned floor min.
Automatic or time controlled drying time.
Reduces the drying time somewhat.
Drying time of cleaned floor min.
Drying time:> 60min metal.