Examples of using Work phases in English and their translations into German
{-}
-
Colloquial
-
Official
-
Ecclesiastic
-
Medicine
-
Financial
-
Ecclesiastic
-
Political
-
Computer
-
Programming
-
Official/political
-
Political
At this, all work phases from design to construction supervision are performed.
Self-evidently, you can also engage GID for development of separate and interrelated work phases.
All work phases, including the detail engineering are carried out with our own resources.
Planning of the technical system from determining the basics to construction supervision work phases 1-8 of HOAI.
Most of the programs described consist of 3 work phases: warm up; training; cool down.
Current construction work is likewise supported as far as possible- generally during work phases 1 to 3.
Planning of the supply technology and construction supervision(work phases 1 to 9) for the following trades.
In later work phases, Prelog continually returns to individual elements from past creative periods
Working smart and efficiently requires equipment that can complete several different work phases and can be equipped with many different types of accessories.
the electrical system in work phases 3 to 8 after HOAI was planned.
The exhibition in Berlin brings together important works from her different work phases, enabling viewers to gain an understanding of her work in its entirety.
the electrical system in work phases 3 to 8 after HOAI was planned.
During intensive work phases, they prepare significant orchestral works from all periods; contemporary music and premieres of new compositions are an integral part of the repertoire.
The range of services includes all work phases of project planning
the breaks between his countless work phases, and his switching back and forth between themes cause irritation.
low voltage current, in the work phases from 2 to 8 after HOAI were provided.
recorded on the formwork drawings for the work phases.
taking on a new structure for certain work phases, situations and tasks.
Work phases 1 to 4 and work phase 6(partially) according to HOAI.
We face up to all work phases, from the draft to the hand-over of keys.