Examples of using Freight corridor in English and their translations into Romanian
{-}
-
Colloquial
-
Official
-
Medicine
-
Ecclesiastic
-
Ecclesiastic
-
Computer
-
Programming
a single place to both request and receive answers relating to infrastructure capacity for freight trains crossing at least one border along the freight corridor.
the infrastructure managers, each freight corridor should be supported by a governance body comprised of the various infrastructure managers who are involved with the freight corridor.
the rail freight market on the freight corridor and performance measured in accordance with the provisions referred to in Article 16(2).
to in Article 4(5), the governance body shall draw up a strategy for the development of strategic terminals to enable them to meet the needs of rail freight running on the freight corridor.
expected changes in the traffic in the freight corridor and those parts of the transport system which are connected to it.
sufficient to create the freight corridor;
Terminal" shall mean the installation provided along the freight corridor which has been especially arranged to allow either the loading and/or the unloading of goods onto/from freight trains,
Operators requesting infrastructure capacity for freight trains crossing at least one border along the freight corridor will be able to submit their applicationcorridor..">
more priority TEN-T projects13, this must be integrated into the freight corridor, unless it is dedicated to the passenger transport service;
Compared to the Commission initial proposal, which established the right of applicants other than railway undertakings to request train paths for freight transport where the latter concern one or more sections of the freight corridor, the text agreed by ministers does not contains this provision.
For each freight corridor, the measure proposed is based on a regular analysis of the market
In order to objectively measure the benefits of the measures aimed at the creation of the freight corridor and to guarantee efficient monitoring of such measures, performance indicators for the service along the freight corridor should be introduced and published regularly.
of the Council10 involved in the freight corridor.
supplemented on the basis of proposals for the creation or modification of a freight corridor, and after a Commission decision has been adopted in compliance with the regulatory procedure referred to in Article 18(3).
The freight corridors shall be created in accordance with the following procedure.
Implementation of TEN-T priority projects and the Rail Freight Corridors according to Regulation(EC) No 913/2010 must be on time.
Three freight corridors if the annual performance of rail freight in the Member State concerned is greater than or equal to 70 billion tonne-kilometres.
Two freight corridors if the annual performance of rail freight in the Member State concerned is greater than or equal to 30 billion tonne-kilometres.
Creation of freight corridors, including the combination of road traffic and rail traffic,
The existing system, including hinterland connections and freight corridors, has to be adapted to cope with the expected growth.