Examples of using Capacity calculation in English and their translations into Slovak
{-}
-
Colloquial
-
Official
-
Medicine
-
Financial
-
Ecclesiastic
-
Official/political
-
Computer
-
Programming
For each capacity calculation region, the methodology for an allocation process of cross-zonal capacity based on an economic efficiency analysis
Coordinated capacity calculation shall be performed based on a common system model in accordance with point 2
(21) When performing capacity calculation, regional coordination centres should calculate cross-zonal capacities using data from transmission system operators which respects the operational security limits of the transmission system operators' respective control areas.
By 31 December 2018, all TSOs of each capacity calculation region shall further harmonise as far as possible between the regions the redispatching and countertrading cost sharing methodologies applied within their respective capacity calculation region.
To enable remedial actions to be taken into account in capacity calculation, all TSOs in each capacity calculation region shall agree on the use of remedial actions that require the action of more than one TSO.
consumers(e.g. in the fields of system operation, capacity calculation for interconnectors, security of supply
No later than 16 months after the decision on the capacity calculation regions is taken, all TSOs in each capacity calculation region shall develop a proposal for a common methodology for redispatching and countertrading cost sharing.
Each TSO within each capacity calculation region shall coordinate with the other TSOs in that region the use of remedial actions to be taken into account in capacity calculation and their actual application in real time operation.
No later than 10 months after the approval of the proposal for a capacity calculation region in accordance with Article 15(1), all TSOs in each capacity calculation region shall submit a proposal for a common coordinated capacity calculation methodology within the respective region.
power transfer distribution factors using available remedial actions to be considered in capacity calculation in accordance with Article 25.
the size of the region which shall cover at least one capacity calculation region.
All TSOs of each capacity calculation region shall review the quality of data submitted within the capacity calculation every second year as part of the biennial report on capacity calculation and allocation produced in accordance with Article 31.
Define which costs incurred from using redispatching or countertrading to guarantee the firmness of cross-zonal capacity are eligible for sharing between all the TSOs of a capacity calculation region in accordance with the capacity calculation methodology set out in Articles 20 and 21;
respecting the operational security limits of transmission system operators in the Capacity Calculation Region.
taking into account their technical availabilities for each capacity calculation time-frame.
including the merging of capacity calculation regions in accordance with Article 15(3) where relevant;
Within 16 months after the regulatory approval on capacity calculation regions referred to in Article 15, all the TSOs in each capacity calculation region shall develop a proposal for a common methodology for coordinated redispatching and countertrading.
taking into account uncertainties between the capacity calculation time-frame and real time,
the minimum capacity shall be a margin set in the capacity calculation process as available for flows induced by cross-zonal exchange.
The capacity calculation and allocation methods have developed, with possible further improvement to come as a result of the amended