Examples of using Factory acceptance in English and their translations into Spanish
{-}
-
Colloquial
-
Official
Intelligrated completed a factory acceptance test(FAT) for the KellyMoore project at its St. Louis,
All in all, TESTRANO 600 brings on-site and factory acceptance testing of power transformers to a new level- it has never been so quick and easy.
Our CMC test sets and powerful Test Universe operating software enable you to re-use factory acceptance test plans for commissioning.
Just like the factory acceptance tests(FATs) for our separation systems,
During this month of January, representatives of both companies have gathered in our Barcelona headquarters for the FAT(Factory Acceptance Test), stage preceeding the installation and commissioning of the system.
control system, for which the factory acceptance tests have been carried out.
From process skid design to Factory Acceptance Testing(FAT), we are your one stop provider for 3D modeling,
SPS'assistance in PSE Engineering was carried out for the execution of factory acceptance tests(FAT) to the motocompression system,
Also, after the Factory Acceptance Tests, GMV begins the development phase of the mission planning system to be used by ESA for the launch of the first of these satellites,
the installation of the laboratory buses, between July and August of 2017 GMV successfully passed the Factory Acceptance Test(FAT) and the Site Acceptance Test(SAT),
FAT(Factory Acceptance Test, together with customer),
Making the final factory acceptance tests.
On completion of the Factory Acceptance Test(FAT), the equipments, components, instruments.
Ensure proven quality and compliance of your purchased equipment with our factory acceptance tests.
It is performed to ensure quality assurance during factory acceptance testing and on-site commissioning.
The complex factory acceptance test was a major milestone on the path to the finished plant.
IACIT concludes first stage of the phase 1 of development of the SGTAN with the successful completion of the FAT Factory Acceptance Test.
GMV passed the factory acceptance test(FAT) of version 3 of Sentinel-1's mission planning facility(MPF)
Our factory acceptance testing services offer you.
In March 1972, flights began factory acceptance of the first helicopter(0675/H-31).