Примеры использования Chernobyl NPP на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
Since 1987 he works at Chernobyl NPP as the reactor control engineer,
using environmentally sound technologies; assistance to Ukraine in decommissioning Chernobyl NPP units 1, 2, 3 3 and Shelter.
SSE"Chernobyl NPP" has finished the comprehensive"active" testing of LRTP systems
thematic TV programs that are aired each week at Slavutych town television about life of the Chernobyl NPP staff, work and social activity of the enterprise,
The state-owned specialized enterprise Chernobyl NPP was informed of the opening of programs of familiarization visits for all those who wish to the station,
after the accident at Chernobyl NPP and"Fukushima-1" NPP. .
when after Chernobyl NPP accident a big number of different devices got into the exclusion zone showing different readings in one and the same place.
new facilities construction without which Chernobyl NPP shutdown is impossible, cost of works
sport equipment for children's boarding institutions located in the areas affected by the Chernobyl NPP accident.
The main tasks of Chernobyl NPP are the following.
Emergency training center of NEGC"Energoatom" was created on the basis of emergency actions control center of Chernobyl NPP.
of SSE"Chernobyl NPP.
Interdepartmental(Governmental) Commission on complex solution of Chernobyl NPP problems was established by the Decree of President of Ukraine in April, 2000.
Petro Poroshenko handed out government awards to the workers of specialized enterprise"Chernobyl NPP" and also to the specialists who had been involved in designing
In 2005, under a contract with the Chernobyl nuclear power plant 4 cover transportation gears for 9 spent fuel assemblies transporting within the territory of the Chernobyl NPP were produced.
Scientists of the laboratory explore the processes of spatial redistribution and transformation of physical and chemical forms of man-made radionuclides in soils and waters in the exclusion zone of Chernobyl NPP.
an inscription on the medallion and"courage" image fourth block of Chernobyl NPP.
Petro Brytan from Chernobyl NPP explained that in the aftermath of the accident a sarcophagus was built to try to contain the radioactive fallout.
the"Courage" image of the fourth unit of Chernobyl NPP.
SSE ChNPP was created on the basis of the Chernobyl NPP according to the Decree¹1084/2000 of President of Ukraine dated September 25, 2000 and the Resolution¹399 of the Cabinet of Ministers of Ukraine dated April 25, 2001.