Примеры использования Cost overruns на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
However, the possible reduction in the scope of the plan would not solve the cost overruns.
Member States of the European Union were concerned about the capital master plan cost overruns and had previously called for a full
Any cost overruns should first be met from compensatory reductions identified elsewhere through efficiency measures.
which in turn may create delays and cost overruns for the project.
the capital master plan, the General Assembly requested that details of measures to prevent cost overruns be identified and reported thereon.
For example, it indicated that the capital master plan cost overruns reported by the Administration for the period ended in March 2012 totalled $430 million A/67/5 Vol.
Various assumptions and tolerances have been developed to mitigate risks of cost overruns as well as increased estimates.
caused numerous delays and cost overruns, as indicated in the present report.
However, it urged the Secretariat to identify all ways to mitigate the estimated shortfall and cost overruns.
Significant cost overruns can occur if labor scheduling, equipment usage
The European Union had been concerned to learn that the implementation of the capital master plan had been beset by delays and cost overruns.
construction delays and cost overruns;
Completed design documents were key to maintaining project quality and avoiding cost overruns.
It is likely in all cases that cost overruns and/or reduced delivery will be incurred.
non-completion and cost overruns.
construction delays and cost overruns;
The Advisory Committee reiterates that contingency provisions approved for construction projects serve to provide necessary safeguards against unforeseen cost overruns during project implementation.
delays and cost overruns.
project implementation is subject to the availability of funds which may result in time and cost overruns.
programmes and to resolve cost overruns.