Примеры использования Model validation на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
statistical instruments for HM model validation;
optical parameters for model validation;
welcomed the efforts being made on model validation.
should be employed for model validation, exclusion of climatic
preliminary results could be made available for integrated assessment modelling in 2003 while model validation would continue.
which becomes the new parent powertrain, HILS model validation is not required.
in situ FTIR spectroscopy was used in conjunction with traditional offline analytical techniques to gain valuable insight, mechanistic understanding, and model validation of the chemical reactions being studied.
She stressed that MSC-E would continue model validation, including sensitivity studies,
make recommendations for their use in model validation(CCC, MSC-East);
ozone based on data from EANET network, and compile new measurement data for hemispheric and global model validation(MSC-West, CCC);
compile new measurement data for hemispheric and global model validation(MSC-West, CCC);
Measurement Programme 2004- 2009, the need for information on finer scales, model validation, analysis of uncertainties
Real HILS model validation was not possible for all participating manufacturers within the validation test programme
recognized that the model validation should be pursued in 2003 as a matter of high priority,
recognize that the model validation should be pursued in 2003 as a matter of high priority,
including AEROCOM and the Chemistry-Climate Model Validation Activity(CCMVal), as well as the status of related efforts under the IGAC programme.
by reporting progress in the model validation work to the Task Force on Measurements
optical parameters for model validation; CCC will evaluate ongoing PM monitoring activities in Europe in order to facilitate the harmonization
Force on Measurements and Modelling to assist in model validation.
The Spanish delegation requested that the modelling validation work was not considered finished until the validation requirements were met in all the modelled area.