Примеры использования Relief device на Английском языке и их переводы на Русский язык
{-}
-
Official
-
Colloquial
The pressure relief device(temperature triggered) shall be fitted
Pressure relief device(PRD)" is a device that,
Following this test, the pressure relief device shall comply the requirements of Leak test(Annex 4,
The pressure relief device(temperature triggered) shall be fitted
Pressure relief device(PRD)" means a device that,
Following the thermal and pressure cycling, the pressure relief device shall comply with the requirements of Leak test(Annex 4,
Following these tests, each pressure relief device shall comply with the requirements of Leak test(Annex 3,
Pressure relief device(PRD)(for hydrogen storage systems)" means a device that,
Pressure relief device(PRD)(pressure triggered)(this device sometimes is referred to as"burst disc")" means a one time use device triggered by excessive pressure which prevents a pre-determined upstream pressure being exceeded.
Following this test, the pressure relief device shall comply the requirements of the Leak Test(para.
Following the thermal and pressure cycling, the pressure relief device shall comply with the requirements of the Leak Test(para.
Following these tests, each pressure relief device shall comply with the requirements of the leak test(para.
Following this test, the pressure relief device shall meet comply the requirements of the Leak Test(B 6.2.6.1.8.),
Unless a portable tank in dedicated service is fitted with an approved relief device constructed of materials compatible with the load, the relief device shall comprise a frangible disc preceding a spring-loaded pressure-relief device. .
a second test shall be conducted with the first pressure relief device blocked.
If the container is greater than 1.65 m in length, then if the container is fitted with a pressure relief device at one end, the fire source shall commence at the opposite end of the container.
If the container is fitted with a pressure relief device at one side, the fire source shall commence at the opposite side of the container.
The pressure relief device shall be fitted to the fuel container(s) in such a manner that
more stringent bottom opening and pressure relief device arrangements may be used.
The temperature within the fog chamber is maintained at 30-35 C. Following these tests, each pressure relief device shall meet the requirements of the Leak Test(para. 6.2.6.1.8.), Flow Rate Test(para.