Two large roofs of the restaurant building overlap each other at odd angles, protruding dynamically, giving the space a swirling feel and multilayered complexity.
年から1900年のものは327棟で、1188棟は20世紀以降のものである。
The downtown contains 6 buildings from 1819-50, 327 buildings from 1851-1900, and 1188 buildings from the 20th century.
新製造棟はアセスや外用液剤をグローバルGMP対応で省力化した生産ラインとなる予定です。
This new manufacturing facility is planned to be equipped with automated production lines for Acess and external pharmaceutical products complying with global GMP.
No.1 Formulation Facility is dedicated to suppositories which are manufactured in an integrated manufacturing line from dispersing, filling to packaging.
独房棟は虫が沸き、エアコンはなく、扇風機も壊れている」とイスラエルの新聞Haaretzは報じた。
The wing is bug-infested and without air-conditioning or working fans,' Israeli newspaper Haaretz reported.
そのうち6棟は、2000年に国指定の歴史建造物に指定された。
Six of the buildings were designated National Historic Landmarks in 2000.
棟は回廊で結ばれて移動がしやすく、プライベートが守られた静かな宿でございます。
The building is tied up by a corridor, it is easy to move, it is a quiet accommodation where private was guarded.
This wing for experiments, a special space for students to exert their creative abilities to the full extent, has become a symbol of the Ohashi Campus.
The Arena building underwent renovation from Apr.- Aug. 2016, which included repairing the whole floor, placing LED lighting and equipping movable spectator stands.
The 2-story and 3-story wooden buildings are intricately designed so that all guest rooms face a small courtyard and guests can enjoy the scenery that changes with the seasons.
The garden building was designed by world-class Korean architect Seung Hyo-Sang, under the theme of"aesthetics of the poor", which implies an environmentally friendly concept.
中央やや右に見える大きな洋館2棟は、バンド東端に位置するグランド・ホテルの旧館(左)と新館(右)。
The two rather large buildings in the centre right are the old(left) and new buildings of the Grand Hotel located on the eastern edge of the Bund.
The new synthesis research building will be designed to embrace the strategic concepts as outlined below and will serve as a global research and development base for the Company's Health& Crop Sciences Sector.
Our Advanced Earthquake Engineering Laboratory, which was built in the Institute of Technology in 2015, has two shaking tables. These enable integrated experimentation, measurement, and analysis in research and development on earthquake mitigation.
English
中文
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Bahasa indonesia
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt