英語 での Process time の使用例とその 日本語 への翻訳
{-}
-
Colloquial
-
Ecclesiastic
-
Computer
-
Programming
The process time depends on the amount of data you have in your Google account.
Not only was this process time consuming, but also very expensive and potentially damaging to the local environment.
The process time necessary to set and include a slot is negligible--it is equivalent to a variable instantiation.
Moreover, the process time of egg retrieval and implantation was short, even felt no pain without anesthesia.
Process time and complexity, energy and waste for production and maintenance are significantly reduced- good for manufacturers and the environment.
To get a better view of the process time of each request, you should use benchmarking tools, like Apache Bench or JMeter.
Process time monitoring, peak value confirmation is available and frequently feth date is not necessary.
The process time depends on the type of skin, on its core- an average of 10-12 hours.
This helped us to reduce process time, speed up the pace of production and improve product quality with lower labor intensity.
Process time is defined as the amount of CPU time used by a process. .
If the process time(averaging time) is shorter, the dead time decreases and the time required for analysis is shortened.
Short process time is a key feature of the INUBIA B6 and B12 machines.
To ensure a low CO2 consumption and a very short process time a new filler concept was developed.
With the same kind of machine to complete drilling and cutting function can reduce process time and cutting costs.
(1) Accelerate product cooling, facilitate on-line packaging, and save process time.
Temperature falling takes only a short period of time, reducing the process time.
Please fill in the form below to buy your e-visa online now(24-hour process time).
In order to respond to increasing high frequencies, higher shielding property is required; however, sputtering needs longer process time for a thicker film.
Integration of systems to perform parallel tasks such as preflow during traverse or IHS can improve process time.
The process time to complete washing and drying cycle for one piece of work is 33 seconds*.