With this completed expansion, the floor space of the clean room has been enlarged from 2,520 m2 to 5,870 m2 and production capacity of XY stages at Okayama Works has been increased from 35 units to 100 units per year.
Particular concern: the clean room terminal air filter need protection air filter efficiency no less than F8(this for fresh air filtration) the air conditioning system need the air filter protect also.
Harmless/No dust: we develop safe packaging materials by making full use of materials choice(material acquisition FDA) for food, the processing in the clean room, and the technology analysis and evaluation.
The clean room safety door is made of high-quality galvanized steel sheet, Italy PrimaPower-imported sheet metal production line, and multiple Japanese YASKAWA Yaskawa robotic joints.
The air shower room is the necessary channel to enter the clean room, which can reduce the pollution problems caused by entering and exiting the clean room..
When installing the clean room, there are a several levels of detail to decide by the company's philosophy and strategic target of realistic production line.
In order to realize the clean room environment of houses, preschools, and hospitals, we will aim to manufacture adhesives that do not generate room air pollution(zero pollution) while maintaining original adhesive characteristics.
Thus, the time required for operators to enter/exit the clean room(e.g., changing into lint-free clothes and passing through an air shower) can be reduced.
IJK has adopted a clean room to manufacture specialized bearings adaptive to special environments such as corrosive and high temperature environments. The clean room of IJK is maintained at Class 1000.
It is the necessary passage for people to enter and leave the clean room, and at the same time it plays the role of the air lock room to seal the clean room..
These integrated prefabricated panels can be moved, and the panels can be replaced directly without the need to remove all the wall panels, modular assembly, no color difference, and make the clean room more beautiful.
The cargo shower room is the necessary passage for the goods to enter the clean room, and it can reduce the pollution problems caused by the goods entering and leaving the clean room.
We offer items in consideration of safety at the customers' facility involving the various issues of the clean room environment such as discomfort due to clean wear, restrictions in movement, leg fatigue, pressure from gloves, and prevention of injury to the limbs.
Air-conditioning process in a clean room: The new technology makes it possible to predict the air currents, temperatures, humidity and pressures of the overall factory including air-conditioning equipment and the clean room, with higher degree of accuracy than conventional levels, almost identical to actual conditions, maximizing energy conservation.
Clean Room Building C of Yokkaichi Plant Completed in July of 2014, the Clean Room Building C of Yokkaichi Plant incorporates advanced soil liquefaction prevention measures to ensure stable operation of precision instruments as well as help withstand earthquakes with seismic isolation structure.
The wind speed of the blower system designed with the new design concept can reach a super wind speed of 25m/s~32m/s, ensuring that the personnel and goods entering the clean room can achieve the perfect effect of complete dust removal.
The air blowing system using the Archimedes spiral design achieves an ultra-strong wind speed of 25m/s~30m/s, ensuring that the personnel and goods entering the clean room can achieve the perfect effect of complete dust removal.
The customized convenient cut outs cleanroom wall panel system can be cut directly in the factory, the hole is reserved, the built-in keel is built, the site is installed, the appearance is convenient and fast, and the product is applied to the clean room vent, lamp mouth, equipment mouth, etc., to prevent the opening of the site twice.
The customized convenient cut outs cleanroom wall panel system can be cut directly in the factory, the hole is reserved, the built-in keel is built, the site is installed, the appearance is convenient and fast, and the product is applied to the clean room vent, lamp mouth, equipment mouth, etc., to prevent the opening of the site twice.
English
中文
عربى
Български
বাংলা
Český
Dansk
Deutsch
Ελληνικά
Español
Suomi
Français
עִברִית
हिंदी
Hrvatski
Magyar
Bahasa indonesia
Italiano
Қазақ
한국어
മലയാളം
मराठी
Bahasa malay
Nederlands
Norsk
Polski
Português
Română
Русский
Slovenský
Slovenski
Српски
Svenska
தமிழ்
తెలుగు
ไทย
Tagalog
Turkce
Українська
اردو
Tiếng việt