Examples of using Preliminary design in English and their translations into Arabic
{-}
-
Political
-
Colloquial
-
Ecclesiastic
-
Ecclesiastic
-
Computer
Specifically, the preliminary design will encompass solutions for.
FREE consultant service and FREE preliminary design for you?
the first stage will be the preliminary design.
The preliminary design was completed in 2011 and the detailed design is currently under way.
A time frame of six to nine months was proposed for planning and preliminary design.
The next phase is the development of architecture and preliminary design. It includes the following elements;
Water supply and sewage, as well as their preliminary design, starting from scratch for each object.
Meanwhile, the KOREASAT F3 programme was initiated in 1997 with preliminary design completed the same year.
A time frame of six to eight months was proposed by the team for procurement and preliminary design.
The repositioning of the building and application of the Headquarters MOSS guidelines necessitated some revisions to the preliminary design.
A budget conference committee then voted in September to restore enough funds for site selection, planning, and preliminary design.
According to your special needs, design products, train technical operators for you to carry out preliminary design and construction design. .
It is anticipated that the time frame for the planning and preliminary design of the project would be six to nine months.
Prokon was to prepare detailed working drawings within the framework of the preliminary design and design drawings prepared by MEW's designer.
The third-generation technology CAP1400 nuclear power plant had passed the preliminary design and evaluation phases, and would enter the construction phase in 2014.
New housing decoration process, four steps, Preliminary design, main body, Water and electricity transformation, Carpenter and stick imitation marble.
The modified Code 3.1 also provides for the submission of fuller design information as the design is developed early in the project definition, preliminary design, construction and commissioning phases.
The modified Code 3.1 also provides for the submission of fuller design information as the design is developed early in the project definition, preliminary design, construction and commissioning phases.
A detailed preliminary design and cost analysis would be undertaken within six to nine months and a progress report would be submitted to the General Assembly at its sixtieth session.
The modified Code 3.1 also provides for the submission of fuller design information as the design is developed early in the project definition, preliminary design, construction, and commissioning phases.